Jewesson Residence


Heavily treed lot with cabin (originally built in 1970)

First visit to property in May 2017

Protection placed at back of cabin before trees felled

Fallers and skidder operator plan tree removal

Geotechnical inspection performed under the watchful eye of homeowners pet

Tree removal underway and lake view revealed

New house site behind cabin exposed

Geotechnical assessment of site to determine excavation and house placement requirements

Excavator and truck arrive on site to begin site preparation

3D drawing of initial house plan